3 MW wind project by Shah Foils
#1206of 1935 in Renewable energy#632of 975 in India#919of 1459 in CDM (UNFCCC)
Audit Analysis
A 3 MW CDM wind project in India with a confirmed investment-test additionality assessment by TÜV NORD CERT, but limited by a project-specific baseline, 21 material findings at validation (all subsequently resolved), and a near-total absence of monitoring-period data. The low extraction confidence and lack of verified emission reductions figures constrain confidence in the project's ongoing performance.
Red Flags
- 21 material findings raised at validation, including questionable financial assumptions (project cost of Rs.62.2 mn/MW vs. GERC-recommended Rs.46.5 mn/MW, unexplained 65/35 captive-export split, wheeling charges applied to entire generation)
- No monitoring-period data or verified ERR figures found in any available document; total ERR claimed (57,690 tCO2e) cannot be cross-checked against actual performance
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
- Grid emission factor of 0.922 tCO2/MWh is from 2009 and no updated value or reassessment is documented
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
Avoidance project, no reversal risk
0% deduction, reasonable for wind
Project-specific, no reassessment data
Mentioned but FPIC/grievance not documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →