30MW Puyo Hydropower Project
#1474of 1935 in Renewable energy#15of 19 in Philippines#1220of 1459 in CDM (UNFCCC)#1125of 1287 in ACM0002
Audit Analysis
The 30 MW Puyo Hydropower Project is a standard CDM avoidance project with a jurisdictional grid baseline and VVB-confirmed additionality, but the available record is severely limited to a 2012 validation report and PDD with no monitoring data. A seven-fold discrepancy between the PDD and validation report on total emissions reductions, combined with 13 material findings at validation and low document extraction confidence, significantly undermines confidence in the project's data integrity and claim accuracy.
Red Flags
- Total ERR discrepancy of 7× between the PDD (769,006 tCO₂e) and the validation report (109,858 tCO₂e) — the basis for the difference is unexplained in the available documents
- 13 material findings (CARs) at validation covering missing methodology justification, inconsistent power-plant list, absent monitoring parameters, and incomplete additionality analysis
- No monitoring reports, verified ERR figures, or monitoring period data are present in the extracted record
- Low extraction confidence on at least one key document, reducing reliability of the available data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project
0 % deduction, appropriate for hydro
Jurisdictional grid EF (0.5605, 2011)
FPIC, safeguards, benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →