Skip to main content
CDMWindSouth KoreaAMS-I.D

3MW Shinan Wind power project

CDM-3110 ↗

#57of 1935 in Renewable energy#1of 24 in South Korea#36of 1459 in CDM (UNFCCC)#19of 806 in AMS-I.D

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A standard 3 MW onshore wind project in South Korea using the simplified CDM methodology AMS-I.D, with VVB-confirmed investment additionality and a jurisdictional grid baseline. The project delivered approximately 105% of its pro-rata emission reduction expectation for the first monitoring period, with no reversal risk inherent to the wind-displacement design. Minor documentation discrepancies across the PDD, validation report, and monitoring report were identified but are explainable by differing document purposes and time bases.

Red Flags

  • Baseline method is described as 'jurisdictional' in the monitoring report but as 'project' in the validation report — the more recent monitoring report and the grid-emission-factor approach (0.6096 tCO₂/kWh, 2007) support the jurisdictional reading, but the inconsistency warrants attention.
  • Crediting period differs between the PDD (2009-12-01 to 2016-11-30) and the monitoring report (2010-04-18 to 2017-04-17); the PDD is also dated later (2013) than the monitoring report (2012), an unusual sequencing that raises questions about which document reflects the registered period.
  • Grievance mechanism is not documented in the extracted record, leaving a gap in the safeguards picture despite FPIC being confirmed.

Credit Vintages

IssuedRetiredAvailable
2013
8,18408,184
Total8,18408,184

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind displacement – no reversal risk

Leakage

0% – negligible for wind

Baseline

Jurisdictional but doc inconsistency

Safeguards

FPIC done; grievance gap

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents