3MW Shinan Wind power project
#57of 1935 in Renewable energy#1of 24 in South Korea#36of 1459 in CDM (UNFCCC)#19of 806 in AMS-I.D
Audit Analysis
A standard 3 MW onshore wind project in South Korea using the simplified CDM methodology AMS-I.D, with VVB-confirmed investment additionality and a jurisdictional grid baseline. The project delivered approximately 105% of its pro-rata emission reduction expectation for the first monitoring period, with no reversal risk inherent to the wind-displacement design. Minor documentation discrepancies across the PDD, validation report, and monitoring report were identified but are explainable by differing document purposes and time bases.
Red Flags
- Baseline method is described as 'jurisdictional' in the monitoring report but as 'project' in the validation report — the more recent monitoring report and the grid-emission-factor approach (0.6096 tCO₂/kWh, 2007) support the jurisdictional reading, but the inconsistency warrants attention.
- Crediting period differs between the PDD (2009-12-01 to 2016-11-30) and the monitoring report (2010-04-18 to 2017-04-17); the PDD is also dated later (2013) than the monitoring report (2012), an unusual sequencing that raises questions about which document reflects the registered period.
- Grievance mechanism is not documented in the extracted record, leaving a gap in the safeguards picture despite FPIC being confirmed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 8,184 | 0 | 8,184 | |
| Total | 8,184 | 0 | 8,184 |
Risk Indicators
VVB-confirmed investment test
Wind displacement – no reversal risk
0% – negligible for wind
Jurisdictional but doc inconsistency
FPIC done; grievance gap
CORSIA/CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →