Skip to main content
CDMWindIndiaAMS-I.D

4.2 MW Wind power project at Kutch, Gujarat by Kush Synthetics Pvt. Ltd.

CDM-10127 ↗

#58of 1935 in Renewable energy#33of 975 in India#37of 1459 in CDM (UNFCCC)#20of 806 in AMS-I.D

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A 4.2 MW wind power project in Gujarat, India, verified under CDM with a jurisdictional grid-emission-factor baseline and a VVB-confirmed investment additionality test. The project carries low inherent risk (no feedstock, no storage, no reversal exposure), and all six corrective action requests raised during validation were closed satisfactorily. Main gaps are the absence of documented FPIC/grievance mechanisms and the lack of a stated CORSIA or CCP eligibility position.

Red Flags

  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed
  • FPIC and grievance mechanism are not documented despite safeguards being mentioned in the PDD
  • Six corrective action requests were raised during validation (template error, crediting-period inconsistency, EF calculation method, etc.), indicating initial documentation quality issues, though all were closed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind – no reversal risk

Leakage

0% – appropriately negligible for wind

Baseline

Jurisdictional grid EF (CEA 2014)

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents