Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

4.2 MW Wind Power Project by National Enterprises at Tamil Nadu, India

VCS-1088 ↗

#740of 1935 in Renewable energy#366of 975 in India#441of 1339 in Verra (VCS)#255of 806 in AMS-I.D

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A 4.2 MW wind project in Tamil Nadu with VVB-confirmed additionality and inherently low permanence risk, but undermined by a significant gap between ex-ante and verified emissions reductions (~56% delivery), a baseline method contradiction across verification reports, and the absence of documented safeguards, FPIC, or a grievance mechanism. Multiple material findings related to meter calibration and missing documentation further erode confidence in the MRV chain.

Red Flags

  • Verified ERR (30,981 t) is only ~56% of the pro-rata ex-ante expectation for the 6-year monitoring period, raising questions about the accuracy of the original capacity-factor assumptions
  • Baseline method is contradictory: the 2024 verification report states 'project' while the 2021 verification report states 'jurisdictional' — the applicable baseline approach is unclear
  • No FPIC, no grievance mechanism, and no safeguards documentation in the most recent (2024) verification report, despite the project operating in a community context
  • Meter calibration certificates were missing for the entire 2012–2018 monitoring period; a correction factor was applied retroactively, introducing uncertainty into the energy measurement
  • Multiple corrective actions remain open, including missing commissioning certificates, O&M agreements, and State Pollution Control Board consents

Credit Vintages

IssuedRetiredAvailable
2012
6,6506,6464
2013
3,8333,8330
2014
4,3654,3650
2015
3,8513,8510
2016
5,4235,4230
2017
6,6896,6890
2018
1701700
Total30,98130,9774

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind energy – no reversal pathway

Leakage

0% deduction, reasonable for grid-displacement

Baseline

Method contradicts across reports (project vs. jurisdictional)

Safeguards

No FPIC, grievance mechanism, or safeguards in 2024 VR

Double-claim

CORSIA not eligible; CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents