4.2 MW Wind Power Project by National Enterprises at Tamil Nadu, India
#740of 1935 in Renewable energy#366of 975 in India#441of 1339 in Verra (VCS)#255of 806 in AMS-I.D
Audit Analysis
A 4.2 MW wind project in Tamil Nadu with VVB-confirmed additionality and inherently low permanence risk, but undermined by a significant gap between ex-ante and verified emissions reductions (~56% delivery), a baseline method contradiction across verification reports, and the absence of documented safeguards, FPIC, or a grievance mechanism. Multiple material findings related to meter calibration and missing documentation further erode confidence in the MRV chain.
Red Flags
- Verified ERR (30,981 t) is only ~56% of the pro-rata ex-ante expectation for the 6-year monitoring period, raising questions about the accuracy of the original capacity-factor assumptions
- Baseline method is contradictory: the 2024 verification report states 'project' while the 2021 verification report states 'jurisdictional' — the applicable baseline approach is unclear
- No FPIC, no grievance mechanism, and no safeguards documentation in the most recent (2024) verification report, despite the project operating in a community context
- Meter calibration certificates were missing for the entire 2012–2018 monitoring period; a correction factor was applied retroactively, introducing uncertainty into the energy measurement
- Multiple corrective actions remain open, including missing commissioning certificates, O&M agreements, and State Pollution Control Board consents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 6,650 | 6,646 | 4 | |
| 2013 | 3,833 | 3,833 | 0 | |
| 2014 | 4,365 | 4,365 | 0 | |
| 2015 | 3,851 | 3,851 | 0 | |
| 2016 | 5,423 | 5,423 | 0 | |
| 2017 | 6,689 | 6,689 | 0 | |
| 2018 | 170 | 170 | 0 | |
| Total | 30,981 | 30,977 | 4 |
Risk Indicators
VVB-confirmed investment test
Wind energy – no reversal pathway
0% deduction, reasonable for grid-displacement
Method contradicts across reports (project vs. jurisdictional)
No FPIC, grievance mechanism, or safeguards in 2024 VR
CORSIA not eligible; CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →