4.5 MW Grouped Small Hydropower Projects For Grid System By Bhoruka Power Corporation Limited In Karnataka State, India.

VCS-265 ↗

4.5 / 10
Integrity
4.3
Transparency
4.8
Claim Safety
4.1
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a combined test, which supports the project’s core eligibility case.

missing Leakage treatment is weak: the monitoring report states leakage was not addressed and applies a 0% deduction, while an earlier report said leakage was quantified.

Transparency

verified The project has a named VVB, TÜV NORD CERT GmbH, and a defined monitoring period from 2013-01-01 to 2016-02-29.

missing The record shows a large discrepancy between claimed and verified emission reductions, and several corrective actions remained open in the monitoring report.

Claim Safety

verified The project is not marked as CORSIA-eligible, which reduces dual-market claim risk.

missing The verified emissions are far below the claimed amount, and the baseline is project-specific rather than a more robust standardized or jurisdictional approach.

Documentation

verified The extracted record includes multiple official document types, including the PDD, validation report, monitoring report, and issuance-related material.

missing The monitoring report lists many corrective actions, and key items such as buffer pool treatment, grievance register, and usage monitoring details were not found in the extracted record.

Detailed Analysis

Integrity

The project’s additionality is relatively strong because the validation report says the VVB confirmed it through a combined test. However, integrity is weakened by the leakage record: the monitoring report states leakage was not addressed and applies a 0% deduction, even though an earlier monitoring report is said to have quantified leakage. The project is an avoidance activity, so reversal risk is lower than for removals, but the absence of buffer pool information still leaves a permanence evidence gap.

Transparency

Transparency is mixed. The project has a named verifier, TÜV NORD CERT GmbH, and a clear monitoring period, but the record also shows a large gap between claimed and verified emission reductions, which makes the accounting trail harder to trust. The monitoring report contains numerous corrective actions, including missing meter details, calibration information, and joint meter reading clarification, which suggests incomplete MRV documentation.

Claim Safety

Claim safety is limited by the over-claiming signal and weak leakage treatment. The validation report shows 26,723 claimed emission reductions, while a later validation report shows only 17,413 verified, which is a material downward revision. The project is not CORSIA-eligible, which helps reduce dual-claim risk, but the project-specific baseline and unresolved leakage questions still leave over-crediting concerns.

Documentation

Documentation quality is moderate rather than strong. The extracted record includes several official documents and the extraction confidence is high, but the monitoring report still lists many corrective actions and missing items such as grievance register submission, calibration details, and meter documentation. The crediting period is long and the monitoring period is later, but the record does not show a fully clean and complete documentation trail.

Overall

I privileged the later validation report for the verified emissions figure of 17,413 because it is the more recent and more authoritative verification outcome, while the earlier 26,723 figure appears to be an earlier claim. I also privileged the monitoring report’s statement that leakage was not addressed because it is the more conservative and later treatment, even though an earlier report reportedly quantified leakage. The contradictions around grievance mechanisms, safeguards, leakage, and emission totals reduce reliability and justify a downward adjustment in the overall assessment.

Audit Analysis

This is a registered VCS hydropower project with VVB-confirmed additionality, but the evidence base shows several documentation and accounting weaknesses. The biggest concerns are unresolved leakage treatment, missing safeguards documentation, and a large gap between claimed and verified emission reductions.

Project Description

The Shahapur-D9 Project is a canal-based mini hydel scheme that utilizes the distributary-9 of Shahapur Branch canal to generate 1 MW of electric power with a single installed unit of capacity 1000 kW. The Mandagere Project, located in the Mandya district of Karnataka state, utilizes the flows spilling over the anicut from the regulated releases from Gorur dam in Hemavathi river and a gross head of 8 m available in the river due to the presence of Mandagere anicut and rapids on downstream for power generation with two units of each 1750 kW.

Red Flags

  • The monitoring report says leakage was not addressed, while an earlier report said it was quantified, creating uncertainty about whether leakage was properly handled.
  • Claimed emission reductions were 26,723 in one report but only 17,413 were verified later, indicating a substantial over-claim risk.
  • No grievance mechanism, FPIC, or other safeguards were documented in the extracted record, and corrective actions were still required.

Credit Vintages

Issued Retired Available
2006
6,917 6,917 0
2007
9,981 9,981 0
2008
9,473 9,473 0
2009
9,223 9,223 0
2010
8,723 8,723 0
2011
11,269 11,240 29
2012
6,731 6,731 0
2013
5,612 5,612 0
2014
6,658 6,658 0
2015
5,099 5,099 0
2016
44 44 0
Total 79,730 79,701 29

Cosa migliorerebbe questo punteggio

  • Provide a reconciled emissions accounting note that explains the difference between claimed and verified reductions and documents the final accepted figure.
  • Submit complete leakage, safeguards, grievance, and metering evidence, including any buffer pool treatment and the basis for the 0% leakage deduction.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No reversal evidence, but buffer not stated

Leakage

Leakage treatment inconsistent

Baseline

Project baseline, reassessment not stated

Safeguards

No safeguards evidence found

Double-claim

CORSIA ineligible, CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.