4.75 MW Bundled Wind Power Project by Associated Stone Industries (Kotah) Ltd
#335of 1935 in Renewable energy#178of 975 in India#209of 1459 in CDM (UNFCCC)#124of 806 in AMS-I.D
Audit Analysis
A standard 4.75 MW bundled wind project in India under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The first-year monitoring shows under-delivery relative to the pro-rata expectation (approximately 45%), which is conservative but raises questions about the ex-ante estimate. A 10× discrepancy in the claimed lifetime ERR between the validation and monitoring reports is the most significant data-reliability concern.
Red Flags
- The validation report states a lifetime ERR of 88,990 tCO2e while the monitoring report lists 8,899 tCO2e — a 10× discrepancy that is likely a clerical error but undermines data reliability
- No buffer pool or permanence mechanism is documented, and no reversal events data is available for a wind project with a 10-year crediting period
- The grid emission factor is anchored to 2008 data, and no baseline reassessment date is recorded in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 4,010 | 0 | 4,010 | |
| Total | 4,010 | 0 | 4,010 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% with negligible justification (appropriate for wind)
Jurisdictional grid EF baseline
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →