Skip to main content
CDMWindIndiaAMS-I.D

4.8 MW Wind Power CDM Project by Golden Hatcheries

CDM-9562 ↗

#336of 1935 in Renewable energy#179of 975 in India#210of 1459 in CDM (UNFCCC)#125of 806 in AMS-I.D

6.0/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
5.5
Documentation
7.0

Audit Analysis

A 4.8 MW wind power CDM project in India with a VVB-confirmed investment additionality test and jurisdictional baseline, but notable under-delivery (approximately 54% of pro-rata expectation) and a contradiction in how leakage was treated across documents. The project is structurally sound as an avoidance-type renewable energy credit, though several transparency fields remain unreported.

Red Flags

  • The project delivered only ~54% of the pro-rata expected emissions reductions for the elapsed monitoring period (41,687 actual vs ~77,424 expected for 8 of 10 years), suggesting sustained underperformance relative to design assumptions
  • Contradiction in leakage treatment: the 2021 monitoring report states leakage was 'deemed negligible' while a 2011 appendix describes it as 'quantified', creating ambiguity about whether a deduction was ever applied
  • Total verified ERR figure is not stated in the extracted record, preventing independent confirmation of issued credits against the claimed 41,687

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justifications across docs

Baseline

Jurisdictional baseline, grid EF 0.9162 (2011)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents