VCS Energy industries (renewable/non-renewable sources) India Registry: Registered Documentazione completa General Methodology v2.0

4 MW Biomass based cogeneration plant by Godrej Agrovet Ltd.

VCS-1744 ↗

6.7 / 10
Integrity
7.2
Transparency
6.4
Claim Safety
6.1
Documentation
7.0

Score Breakdown

Integrity

verified Additionality was tested using an investment test and was confirmed by the VVB in the monitoring report.

missing Leakage evidence is mixed: the monitoring report says leakage is deemed negligible, but the validation report records it as not addressed.

Transparency

verified The monitoring report provides a clear monitoring period and shows claimed and verified ERRs both at 42,407.

missing Usage monitoring details are not stated in the available documents, and the leakage rationale is not consistent across reports.

Claim Safety

verified The project uses a project baseline under AMS-I.C, and the latest monitoring report shows no gap between claimed and verified ERRs.

missing CORSIA eligibility and CCP status are not stated, so dual-market claim risk cannot be ruled out from the extracted record.

Documentation

verified The record includes multiple official documents, with 16 documents used and high extraction confidence.

missing Baseline reassessment timing is not stated, and no buffer pool percentage is available in the extracted facts.

Detailed Analysis

Integrity

The project scores moderately well on integrity because additionality was tested through an investment test and confirmed by the VVB, and the monitoring report reports no material findings or corrective actions. However, permanence and leakage are not fully evidenced: buffer pool coverage is not stated, reversal events are not found in the extracted record, and leakage treatment is inconsistent across documents. The monitoring report dated 2022-08-04 says leakage is deemed negligible, while the validation report dated 2022-08-12 says leakage was not addressed; I privileged the later monitoring report for the project’s current accounting, but the contradiction still weakens confidence.

Transparency

Transparency is fair but not strong. The monitoring report clearly states the monitoring period from 2020-07-01 to 2021-09-30 and shows total ERRs claimed and verified at 42,407, which supports traceability. At the same time, usage monitoring methodology is not stated in the available documents, and the leakage rationale is not consistently documented across reports, which limits full MRV clarity.

Claim Safety

Claim safety is moderate because the project uses a project baseline under AMS-I.C and the latest monitoring report shows no difference between claimed and verified ERRs. The leakage justification is only partly reliable because of the contradiction between documents, and the extracted record does not state CORSIA eligibility or CCP status. That means the risk of over-claiming or dual-market use cannot be fully excluded from the available evidence.

Documentation

Documentation quality is fairly good overall. The extracted record cites multiple official documents, includes a named VVB, and has high extraction confidence, which supports reliability. Still, some important items are missing or not stated, including buffer pool coverage, baseline reassessment timing, and usage monitoring method, so the documentation is not complete enough for a top score.

Overall

Overall, this is a solid but not exceptional carbon credit record: the latest monitoring evidence is coherent, additionality is VVB-confirmed, and issuance matches verification for the reported period. I privileged the more recent monitoring report over the older validation statement where they conflict on leakage, but the contradiction itself lowers confidence and keeps the score below the top tier. The historical ERR discrepancy between validation documents also suggests some record instability, even though the current claimed and verified totals align.

Audit Analysis

This is a reasonably well-documented VCS biomass cogeneration project with VVB-verified additionality, no reported material findings, and matching claimed versus verified issuance in the monitoring period. The main weaknesses are incomplete leakage and permanence evidence, plus a contradiction in the record on leakage treatment and historical ERR totals that reduces confidence somewhat.

Project Description

Proponent: Godrej Agrovet Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.C. Estimated annual GHG reductions: 97671 tCO2e Region: Asia Registration date: 2018-08-20

Red Flags

  • Leakage treatment is inconsistent across documents: the monitoring report says leakage is deemed negligible, while the validation report says it was not addressed.
  • Historical ERR totals differ between validation documents, which suggests some record inconsistency even though the latest figures match.

Credit Vintages

Issued Retired Available
2018
9,156 0 9,156
2019
51,741 0 51,741
2020
32,006 1,777 30,229
2021
22,475 20,750 1,725
Total 115,378 22,527 92,851

Cosa migliorerebbe questo punteggio

  • Provide a consistent, quantified leakage assessment across validation and monitoring documents, including the basis for any negligible-leakage claim.
  • Disclose buffer pool coverage, baseline reassessment history, and any registry or market-eligibility status relevant to CORSIA or CCP claims.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated

Leakage

Negligible claim but inconsistent

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.