4 MW Kirloskar Wind Farms in Maharashtra
#333of 1935 in Renewable energy#176of 975 in India#169of 1339 in Verra (VCS)#122of 806 in AMS-I.D
Audit Analysis
A 4 MW wind farm project in Maharashtra with a solid jurisdictional baseline and VVB-confirmed investment additionality test, delivering 123% of its pro-rata ex-ante expectation over the 2017–2022 monitoring period. However, the verification process surfaced 12 corrective action requests related to meter calibration delays and documentation inconsistencies, and several key parameters (FNRB, CORSIA/CCP status, FPIC) remain unresolved or contradictory across documents.
Red Flags
- 12 corrective action requests raised during verification, including meter calibration delays at both Varekarwadi and Panchpatta sites, inconsistent export readings, and missing parameters in the emission reduction calculation sheet
- PLF (22.44% Varekarwadi, 20.50% Panchpatta) exceeded the sensitivity analysis range set at validation, requiring re-assessment of additionality
- FPIC status is contradictory: the 2017 verification report states it was not conducted, while the monitoring report of the same date states it was conducted
- Ex-ante lifetime ERR differs substantially between the 2017 validation report (68,510 tCO2e) and the 2024 verification report (40,543 tCO2e), a 41% reduction with no clear explanation in the extracted record
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 3,880 | 3,880 | 0 | |
| 2007 | 4,190 | 4,190 | 0 | |
| 2008 | 7,014 | 7,014 | 0 | |
| 2009 | 6,509 | 6,509 | 0 | |
| 2010 | 5,567 | 5,567 | 0 | |
| 2011 | 7,222 | 7,222 | 0 | |
| 2012 | 6,463 | 6,463 | 0 | |
| 2013 | 7,505 | 7,505 | 0 | |
| 2014 | 5,167 | 5,167 | 0 | |
| 2015 | 5,776 | 5,776 | 0 | |
| 2016 | 5,501 | 5,501 | 0 | |
| 2017 | 4,305 | 3,669 | 636 | |
| 2018 | 4,707 | 0 | 4,707 | |
| 2019 | 5,010 | 100 | 4,910 | |
| 2020 | 4,530 | 0 | 4,530 | |
| 2021 | 5,372 | 0 | 5,372 | |
| 2022 | 6,046 | 0 | 6,046 | |
| Total | 94,764 | 68,563 | 26,201 |
Risk Indicators
VVB-confirmed investment test
Renewable generation – no reversal risk
0% – appropriate for grid-connected wind
Jurisdictional, reassessed 2016, next due 2026
Grievance mechanism present; FPIC status contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →