4 MW Small Hydro Project by Shansha Hydro Power Project Co-Operative Society Ltd.
#590of 1935 in Renewable energy#289of 975 in India#394of 1459 in CDM (UNFCCC)#203of 806 in AMS-I.D
Audit Analysis
A 4 MW small hydro project in India under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project is structurally sound for its type, but the available record contains only validation-stage data with no monitoring reports, and a ten-fold discrepancy in the claimed emission reduction figure between two source documents raises data-reliability concerns.
Red Flags
- Ten-fold discrepancy in total claimed emissions reductions: the validation report (2016) states 18,725 tCO₂e while an earlier appendix (2014) states 187,250 tCO₂e — the privileged value (18,725) is from the more recent and authoritative validation report, but the inconsistency undermines confidence in the project's quantification.
- No monitoring-period data, verified ERR, or FNRB figures are present in the extracted record, making it impossible to confirm that the project is actually delivering the claimed reductions.
- Grid emission factor of 0.9679 tCO₂/MWh is dated to 2014 with no documented update or reassessment, and the crediting period runs to January 2028.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Hydro avoidance – low reversal risk
0 % deduction, minor doc inconsistency
Jurisdictional grid EF, 2014 vintage
Mentioned; FPIC & grievance not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →