49 MW Wind Power Project in Western India
#60of 1935 in Renewable energy#35of 975 in India#38of 1459 in CDM (UNFCCC)#40of 1287 in ACM0002
Audit Analysis
A 49 MW wind power project in Western India under CDM with a combined additionality test verified by DNV and a jurisdictional baseline. The project is a straightforward renewable-energy avoidance activity with reasonable leakage treatment, though several transparency fields (FNRB, CORSIA eligibility, CCP status) are not stated in the available documents. All validation-stage corrections were resolved, and no material findings remain open.
Red Flags
- The PDD lists a total ERR of 76,1590 tCO2e while the validation report (later date) states 76,159 tCO2e — likely a typographical error (extra zero) in the PDD, but it introduces a data-reliability question.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
- The monitoring report covers only the first ~5.5 months of the 10-year crediting period, and the verified ERR exactly matches the claimed ERR with no independent adjustment noted.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 21,498 | 0 | 21,498 | |
| Total | 21,498 | 0 | 21,498 |
Risk Indicators
Combined test, VVB-verified
Wind avoidance, no reversal risk
0% deemed negligible, justified
Jurisdictional, grid EF 0.9
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →