5.5 MW Bundled Wind Power Project by WMI Cranes Ltd

VCS-662 ↗

#725of 1935 in Renewable energy#354of 975 in India#436of 1339 in Verra (VCS)#249of 806 in AMS-I.D

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A 5.5 MW bundled wind power project in India registered under VCS with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered only about 43% of the pro-rata ex-ante expectation for the elapsed monitoring period, raising concerns about baseline optimism. Leakage is set at 0% with a weak justification, and several key MRV parameters (FNRB, usage monitoring, CORSIA/CCP status) are not stated in the available documents.

Red Flags

  • Verified emissions reductions (22,312 tCO2) represent only ~43% of the pro-rata ex-ante expectation (~51,700 tCO2) for the 5.8-year monitoring period out of the 10-year crediting period, indicating the PDD estimate of 89,060 tCO2 lifetime was significantly optimistic.
  • Leakage deduction is 0% with the verification report stating the issue was 'not addressed' rather than providing a quantified justification, while the monitoring report merely labels it 'deemed negligible' — an inconsistent and weak treatment.
  • Three corrective actions were required at verification (LoA from Indian DNA, PDD format non-compliance, missing investment analysis documents), indicating documentation gaps at the time of verification.
  • FPIC was not conducted, and the 2010 validation report records no grievance mechanism or safeguards, creating a gap in social safeguards documentation.

Credit Vintages

IssuedRetiredAvailable
2007
2242240
2008
6,2816,2810
2009
6,5786,5780
2010
2,5622,5620
2012
3,3993,3990
2013
4,0864,0860
2014
3,4023,4020
2015
4,1824,026156
2016
3,83503,835
2017
3,40803,408
Total37,95730,5587,399

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent reversal risk for wind

Leakage

0% deduction, justification weak/inconsistent

Baseline

Jurisdictional but ex-ante estimates ~2.3× actual

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents