Skip to main content
CDMSolarIndiaAMS-I.D

5.6 MW CDM Bundled Solar Power Project in the state of Maharashtra

CDM-10064 ↗

#1344of 1935 in Renewable energy#718of 975 in India#1065of 1459 in CDM (UNFCCC)#433of 806 in AMS-I.D

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A 5.6 MW bundled solar project in Maharashtra validated under CDM AMS-I.D v18 with a confirmed additionality test and jurisdictional baseline, but the record is undermined by a seven-fold discrepancy between the PDD's claimed emissions reductions (52,978 tCO₂e) and the VVB-validated figure (7,568 tCO₂e), three unresolved corrective action requests including a formula non-compliance finding, and a complete absence of monitoring or verification data. The project is in its early crediting period with no post-validation evidence of actual performance.

Red Flags

  • Seven-fold discrepancy in total emissions reductions: the PDD (Oct 2022) claims 52,978 tCO₂e while the validation report (Nov 2022) supports only 7,568 tCO₂e, a ratio of approximately 7:1
  • Corrective Action Request 02 states the emission reduction formula was not in line with the approved methodology (AMS-I.D v18), raising doubt about the robustness of the validated figure
  • No monitoring reports, verification reports, or verified emissions reduction figures are present in the extracted record despite the crediting period beginning in November 2021
  • Baseline method is contradicted across documents: the validation report states 'jurisdictional' while another source references a 'project' baseline

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, 0% deduction justified

Baseline

Jurisdictional but contradicted in source

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents