5 MW Chirchind Grid-Connected SHP in Himachal Pradesh, India

CDM-2729 ↗

#1292of 1935 in Renewable energy#687of 975 in India#1010of 1459 in CDM (UNFCCC)#417of 806 in AMS-I.D

4.7/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.0
Documentation
5.5

Audit Analysis

A 5 MW grid-connected small hydro project in Himachal Pradesh with a VVB-confirmed investment additionality test and a reasonable zero-leakage justification, but undermined by three material findings (including a missing baseline validity demonstration), a baseline-method contradiction between the validation and monitoring reports, and a verified ERR figure that appears to exceed the theoretical maximum generation for the stated plant capacity over the stated monitoring period. Several key data points (FNRB, usage monitoring, CORSIA/CCP status) are absent from the extracted record.

Red Flags

  • Verified ERR of 19,283 tCO2e for the 2018-03-18 to 2018-06-28 monitoring period implies ~20,800 MWh, which exceeds the theoretical maximum of ~12,240 MWh for a 5 MW plant over 102 days — a 70% physical impossibility that raises serious over-crediting concerns
  • Three material findings in the monitoring report: missing applicability-criterion justification, missing demonstration of original baseline validity, and monitoring parameters for grid export and diesel consumption not aligned with AMS-I.D v18.0
  • Baseline method is contradictory: the validation report (2018) states a jurisdictional baseline while the monitoring report (2022) states a project-specific baseline
  • FNRB value, usage monitoring method, CORSIA eligibility, and CCP status are all not stated in the available documents

Credit Vintages

IssuedRetiredAvailable
2012
17,673017,673
2013
18,124018,124
2014
17,145017,145
2015
17,287017,287
2016
16,949016,949
2017
18,459018,459
2022
76,989076,989
Total182,6260182,626

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% with 'deemed negligible' justification

Baseline

Method contradiction; validity finding

Safeguards

Mentioned; FPIC/grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D. ver. 18.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents