5 MW Dehar Grid-connected SHP in Himachal Pradesh, India

CDM-0035 ↗

#28of 770 in Renewable energy#15of 387 in India#2of 213 in CDM (UNFCCC)#7of 417 in AMS-I.D

6.7/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A 5 MW grid-connected small hydro project in Himachal Pradesh, India, verified by DNV under CDM AMS-I.D v16, with a common-practice additionality test and a jurisdictional baseline. The project delivered approximately 95% of its pro-rata ex-ante expectation over the full 7-year crediting period, indicating conservative crediting. Minor gaps exist in MRV detail documentation and one source document is unidentified, but no material compliance issues remain outstanding.

Red Flags

  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis; while reasonable for a grid-connected hydro, the absence of a documented quantification is a minor gap.
  • One of the five source documents is listed as 'unknown' in the evidence record, reducing traceability of the full documentation chain.
  • The additionality test type is inconsistent between the PDD (investment test) and the validation report (common-practice test), creating ambiguity about which test was actually applied.

Credit Vintages

IssuedRetiredAvailable
2007
23,649023,649
2008
31,155031,155
2010
16,065016,065
2011
11,034011,034
2012
22,971022,971
Total104,8740104,874

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, qualitative justification only

Baseline

Jurisdictional grid EF, standardised

Safeguards

Safeguards mentioned, FPIC/grievance not detailed

Double-claim

CDM credits, no CORSIA/CCP channel

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents