Skip to main content
CDMHydroIndiaAMS-I.D

5 MW Dunali Run-of-the-river, Small Hydro Electric Project”, Chamba district, Himachal Pradesh by M/s Jala Shakti Limited (JSL).

CDM-5367 ↗

#741of 1935 in Renewable energy#367of 975 in India#508of 1459 in CDM (UNFCCC)#256of 806 in AMS-I.D

5.4/ 10
Integrity
6.2
Transparency
5.5
Claim Safety
3.8
Documentation
5.8

Audit Analysis

A 5 MW run-of-the-river hydro project in Himachal Pradesh with a VVB-verified investment additionality test and a jurisdictional grid baseline. However, the verified emissions reductions (17,262 tCO2) represent only about 12% of the pro-rata expectation for the elapsed monitoring period, raising serious over-crediting concerns in the ex-ante estimate. Five corrective action requests during validation revealed material errors in the investment analysis and grid emission factor calculation, though all were subsequently resolved.

Red Flags

  • Verified ERR of 17,262 tCO2 is only ~12% of the pro-rata expectation (~140,666 tCO2) for the 8.7-year monitoring period, indicating severe under-delivery or an overly optimistic ex-ante estimate
  • Five corrective action requests (CARs) were raised during validation, including errors in the investment analysis spreadsheet and use of a simple average instead of a generation-weighted average for the grid emission factor
  • Crediting period dates differ between the validation report (2011-10-20 to 2021-10-19) and the monitoring report (2012-04-23 to 2022-04-22), a six-month shift that is unexplained

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, reasonable for hydro

Baseline

Jurisdictional but 2009 grid EF, initially miscalculated

Safeguards

Mentioned but FPIC and grievance mechanism undocumented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents