Skip to main content
UCRSolan Himachal Pradesh IndiaAMS-I.D

5 MW Nand Solar Power Project By M/S K.K.Kashyap Green Solar Energy Producer in Himachal Pradesh

UCR-101 ↗

#1555of 1935 in Renewable energy#23of 433 in Universal Carbon Registry (UCR)#529of 806 in AMS-I.D

4.0/ 10
Integrity
4.0
Transparency
3.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A 5 MW solar project in Himachal Pradesh registered under the UCR standard with a jurisdictional baseline and no material findings, but critically lacking in additionality verification, VVB oversight, and verified emission reduction figures. The project design is reasonable for a solar avoidance project, yet the absence of any verification or monitoring report leaves the core claims unvalidated.

Red Flags

  • No additionality test type or VVB verification is documented in the available PDD, leaving the additionality claim unverified
  • No verified or claimed ERR figures are available in the extracted record, making over- or under-crediting impossible to assess
  • Only a single PDD document is available; no verification report, monitoring report, or VVB sign-off was found

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not documented in available PDD

Permanence

Solar avoidance project, low reversal risk

Leakage

0% deemed negligible, appropriate for solar

Baseline

Jurisdictional method, reassessment timing not stated

Safeguards

FPIC and safeguards mentioned, grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents