5 MW Small Hydro Project by Jawala Hydro Power Pvt. Ltd

CDM-10002 ↗

#818of 1935 in Renewable energy#416of 975 in India#574of 1459 in CDM (UNFCCC)#279of 806 in AMS-I.D

5.3/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A 5 MW small hydro project in India validated under CDM AMS I.D with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project design is sound and the claimed emissions reductions are consistent with the installed capacity, but the available record is limited to the validation stage with no monitoring data, no verified ERR figures, and low extraction confidence, leaving significant evidence gaps on delivery and permanence.

Red Flags

  • No monitoring reports or verified ERR figures found in the extracted record; only the 2014 validation report provides quantitative data
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable and data completeness is uncertain
  • No buffer pool or permanence mechanism documented; hydro projects carry drought and reservoir-change reversal risk that is unaddressed in the available record
  • Contradiction between the validation report (leakage 'deemed negligible') and a 2012 appendix (leakage 'quantified') suggests the leakage treatment was not consistently documented

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, minor doc contradiction

Baseline

Jurisdictional grid EF (2012)

Safeguards

Safeguards mentioned; FPIC and grievance not confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents