Skip to main content
UCRHimachal Pradesh IndiaAMS-I.D

5 MW Small Scale Taraila Small Hydroelectric Project by Ginni Global Ltd.

UCR-111 ↗

#463of 770 in Renewable energy#2of 13 in Himachal Pradesh India#25of 421 in Universal Carbon Registry (UCR)#173of 417 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 5 MW small hydro project in Himachal Pradesh, India, registered under the UCR standard with a jurisdictional baseline and a grid emission factor of 0.9 tCO₂/MWh (2014). The PDD documents FPIC, safeguards, benefit sharing, and smart-meter monitoring, with no material findings or corrective actions. However, the absence of a verification report, monitoring report, VVB identification, and any ERR figures leaves the project's actual performance and additionality unverified.

Red Flags

  • No verification report or monitoring report found in the extracted record; only the PDD is available, leaving all performance claims unverified
  • Additionality test type and VVB verification status are not stated in any available document
  • No buffer pool or permanence mechanism is documented, and no reversal-event data is available
  • The PDD is dated 2022-03-02, which post-dates the end of the crediting period (2021-12-31), raising questions about the registration timeline

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated

Permanence

No buffer pool or reversal data documented

Leakage

0% deemed negligible, consistent with hydro

Baseline

Jurisdictional baseline, reassessment timing not stated

Safeguards

FPIC, safeguards, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents