5 MW Solar PV Power Plant CDM Project by OPG Energy Private Ltd., - Baap, Jodhpur, Rajasthan, India

CDM-10125 ↗

#412of 1935 in Renewable energy#212of 975 in India#262of 1459 in CDM (UNFCCC)#149of 806 in AMS-I.D

5.9/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A 5 MW solar PV CDM project in Rajasthan, India, with VVB-confirmed additionality and a reasonable zero-leakage treatment for grid-displacement. However, a contradiction between the validation report (project-specific baseline) and the monitoring report (jurisdictional baseline), combined with a grid emission factor dated to 2013 and several missing operational data points (verified ERR, FNRB, usage monitoring), limits confidence in the credit quantity. All six validation-stage corrective actions were resolved, and no reversal events were reported.

Red Flags

  • Baseline method is stated as 'project-specific' in the 2015 validation report but 'jurisdictional' in the 2021 monitoring report — the grid emission factor (0.958, year 2013) may not reflect the actual project-specific grid, creating over-crediting risk.
  • Verified ERR figure is not stated in the extracted record; only the claimed total of 40,813 tCO2e (monitoring report, 2021) is available, preventing independent cross-check of the credit quantity.
  • Grid emission factor is anchored to 2013 data; no evidence of periodic EF updates or sensitivity analysis across the 2016–2020 monitoring period.

Credit Vintages

IssuedRetiredAvailable
2021
40,813040,813
Total40,813040,813

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

0% with sound justification

Baseline

Method contradiction, dated EF

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents