5 MW Wind Power Project by Gokul Refoils and Solvent Limited

CDM-4062 ↗

#24of 1935 in Renewable energy#16of 975 in India#16of 1459 in CDM (UNFCCC)#2of 44 in AMS-I.F

7.0/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A straightforward 5 MW onshore wind project in India displacing grid electricity, validated under CDM AMS-I.F with a confirmed investment additionality test and a jurisdictional grid baseline. The project delivered approximately 70% of its pro-rata expected emissions reductions in the first monitoring period, indicating conservative crediting. Several inter-document contradictions exist but are largely explainable by differences in document type and timing.

Red Flags

  • 41 Corrective Action Requests were raised during validation, indicating a lengthy review process, though all were closed before issuance
  • Five contradictions between documents (leakage treatment, benefit sharing, ERR figures, baseline method, crediting period) reduce confidence in data consistency
  • No buffer pool or permanence mechanism is documented, though inherent reversal risk for wind is low

Credit Vintages

IssuedRetiredAvailable
2013
5,95605,956
Total5,95605,956

Risk Indicators

Additionality

VVB-confirmed investment test, IRR below benchmark

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, negligible for grid-connected wind

Baseline

Jurisdictional grid EF from CEA database

Safeguards

Safeguards mentioned but FPIC and grievance mechanism not de

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents