Skip to main content
CDMWindIndiaAMS-I.D

5 MW Wind Power Project of Alembic Ltd at Bhavnagar, Gujarat, India

CDM-1456 ↗

#83of 1935 in Renewable energy#45of 975 in India#47of 1459 in CDM (UNFCCC)#29of 806 in AMS-I.D

6.7/ 10
Integrity
7.5
Transparency
6.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

A straightforward 5 MW wind project in Gujarat using the standard AMS-I.D. methodology with a jurisdictional grid emission factor baseline. Additionality is well-supported by a VVB-confirmed combined test (investment plus regulatory barriers), and the project carries no meaningful reversal risk. The main weaknesses are a cluster of inter-document contradictions, several unaddressed governance fields (CORSIA, CCP, FPIC, grievance mechanism), and only medium extraction confidence across 13 source documents.

Red Flags

  • Seven contradictions identified across documents, including a baseline-method discrepancy (project-specific in the validation report vs. jurisdictional in the monitoring report) and a benefit-sharing description present in the PDD but absent in the validation report.
  • CORSIA eligibility and CCP status are both unstated in the extracted record, leaving dual-channel or double-claiming risk unassessed.
  • FPIC and grievance mechanism fields are not documented in any available source, despite safeguards being broadly mentioned.
  • One evidence document is classified as 'unknown' type, reducing confidence in the completeness of the documentary record.

Credit Vintages

IssuedRetiredAvailable
2010
8,08508,085
2012
16,289016,289
2015
31,957031,957
2021
23,894023,894
Total80,225080,225

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind displacement, no reversal risk

Leakage

0% justified for grid displacement

Baseline

Jurisdictional grid EF, standard

Safeguards

Mentioned but FPIC/grievance undocumented

Double-claim

CORSIA and CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents