5 MWp bundled solar power project in Gujarat
#413of 1935 in Renewable energy#213of 975 in India#263of 1459 in CDM (UNFCCC)#150of 806 in AMS-I.D
Audit Analysis
A 5 MWp bundled solar project in Gujarat validated under CDM AMS I.D v17 with a jurisdictional grid baseline and VVB-confirmed additionality. The project is an avoidance-type solar installation with low reversal risk, but the record lacks monitoring-period data, verified ERR figures, and FNRB details, limiting the ability to confirm delivery against claims. A minor contradiction on leakage treatment (deemed negligible vs. quantified) introduces a small reliability concern.
Red Flags
- No monitoring-period data or verified ERR figures are available in the extracted record, preventing any pro-rata delivery check against the 50,316 tCO₂ lifetime claim.
- Leakage justification is contradictory: the validation report (2012) states 'deemed negligible' while an undated appendix references a 'quantified' treatment; the 0% deduction rests on the weaker justification.
- FNRB method and value are not stated in any available document, leaving the net final residual benefit unverified.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification contradicted by appendix
Jurisdictional grid EF, standard for solar
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →