Skip to main content
CDMSolarIndiaAMS-I.D

5 MWp bundled solar power project in Gujarat

CDM-6925 ↗

#413of 1935 in Renewable energy#213of 975 in India#263of 1459 in CDM (UNFCCC)#150of 806 in AMS-I.D

5.9/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A 5 MWp bundled solar project in Gujarat validated under CDM AMS I.D v17 with a jurisdictional grid baseline and VVB-confirmed additionality. The project is an avoidance-type solar installation with low reversal risk, but the record lacks monitoring-period data, verified ERR figures, and FNRB details, limiting the ability to confirm delivery against claims. A minor contradiction on leakage treatment (deemed negligible vs. quantified) introduces a small reliability concern.

Red Flags

  • No monitoring-period data or verified ERR figures are available in the extracted record, preventing any pro-rata delivery check against the 50,316 tCO₂ lifetime claim.
  • Leakage justification is contradictory: the validation report (2012) states 'deemed negligible' while an undated appendix references a 'quantified' treatment; the 0% deduction rests on the weaker justification.
  • FNRB method and value are not stated in any available document, leaving the net final residual benefit unverified.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification contradicted by appendix

Baseline

Jurisdictional grid EF, standard for solar

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents