50 MW Kurnool Solar PV Power Project by M/s Prayatna Developers Pvt. Ltd. at Gani, Kurnool, AP.
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core eligibility case.
missing Leakage treatment is weak: the monitoring report says it was not addressed, while the PDD says it was deemed negligible; the monitoring report also lists several CARs and CLs.
Transparency
verified A named VVB, SustainCert, is identified and the monitoring period is stated in the monitoring report.
missing The report set contains missing or inconsistent core figures, including no verified or claimed ER totals in the extracted record and several corrective actions on missing data and inconsistent meter counts.
Claim Safety
verified The project uses ACM0002 and the baseline was reassessed in 2023, which is better than an unrevised project baseline.
missing Claim safety is weakened by unresolved leakage treatment, inconsistent emission reduction values in the monitoring report, and CORSIA eligibility being true while CCP status is not mentioned.
Documentation
verified The record includes both a monitoring report and a PDD, and extraction confidence is high.
missing The monitoring report still required multiple corrective actions, including missing generation months, missing calibration details, and inconsistent meter and ER values.
Detailed Analysis
Integrity
The project has a solid starting point because the VVB confirmed additionality through an investment test, and no reversal events are reported in the extracted record. However, leakage is a concern because the monitoring report says it was not addressed, while the PDD says it was deemed negligible, and the report also records 2 CARs and 4 CLs. The absence of a buffer pool figure and any explicit reversal treatment further limits confidence in permanence-related controls.
Transparency
Transparency is mixed. The monitoring report identifies SustainCert as the VVB and provides a monitoring period, but the extracted record does not include verified or claimed emission reduction totals, and several key operational details are missing or inconsistent. The report also notes missing generation data and inconsistent meter counts, which reduces the clarity of the MRV trail.
Claim Safety
Claim safety is moderate at best. The project uses ACM0002 and the baseline was last reassessed in 2023, which supports methodological credibility, but leakage is inconsistently treated across documents and the monitoring report flags inconsistent ER values. CORSIA eligibility is marked true, while CCP status is not mentioned, so dual-market claim risk is not fully resolved.
Documentation
Documentation is reasonably broad because both a PDD and a monitoring report are present and extraction confidence is high. Even so, the monitoring report required multiple corrective actions, including missing months of generation data, missing calibration details, and unresolved ER inconsistencies. The crediting period also appears inconsistent across documents, with the monitoring report and later PDD dates not fully aligned.
Overall
Overall, this is a mid-quality file with some real strengths, especially VVB-confirmed additionality and a named verifier, but also several reliability issues. I privileged the monitoring report for leakage and crediting-period details because it is the more direct operational evidence, while noting that the later PDD conflicts on both points; that contradiction lowers confidence rather than resolving it. The project’s CORSIA eligibility and missing CCP status keep claim safety from scoring higher, and the multiple CARs/CLs materially weaken documentation quality.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and no reversal events reported, but key risk controls are weakly documented. Leakage treatment is inconsistent across documents, and the monitoring report shows several corrective actions and data inconsistencies that reduce confidence in the claimed emission reductions.
Project Description
Developer: Infinite Environmental Solutions Limited Type: Solar Thermal - Electricity Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2018-11-16 → 2028-11-15 Estimated annual credits: 89549 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Leakage is not addressed in the monitoring report, while the PDD reportedly treats it as negligible, creating a documentation inconsistency.
- The monitoring report lists multiple corrective actions, including missing generation data and inconsistent emission reduction values, which weakens confidence in the reported results.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 94,698 | 0 | 94,698 | |
| 2022 | 95,410 | 0 | 95,410 | |
| 2023 | 89,301 | 0 | 89,301 | |
| Total | 279,409 | 0 | 279,409 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled leakage assessment and explicitly align the monitoring report with the PDD on whether leakage is negligible or deducted.
- Publish a clean, fully consistent MRV package with verified emission reduction totals, meter calibration evidence, and closure of all CARs and CLs.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal events reported, but buffer treatment not stated
Leakage treatment inconsistent across documents
Project baseline with reassessment timing stated
FPIC and grievance mechanism documented
CORSIA eligible; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →