50 MW Tsetsii Wind Farm in Mongolia
#533of 1935 in Renewable energy#294of 1339 in Verra (VCS)#404of 1287 in ACM0002
Audit Analysis
The 50 MW Tsetsii Wind Farm is a standard VCS renewable energy project with a verified investment additionality test and conservative verification (verified ERR below claimed). However, the project carries 14 corrective actions from the 2024 verification, inconsistent leakage and baseline-method descriptions across documents, and absent safeguards documentation (no FPIC, no grievance mechanism per the final verification report), which collectively moderate confidence in the credit's robustness.
Red Flags
- 14 corrective actions required in the 2024 verification report, including missing commissioning certificate, calibration inconsistencies, and import electricity not deducted from gross generation
- Safeguards documentation is absent in the final 2024 verification report: no FPIC, no grievance mechanism, and benefit-sharing not described
- Baseline method is contradictory across documents: the 2022 verification report states a project-specific baseline while the 2024 monitoring report references a jurisdictional baseline
- Leakage justification is inconsistent: the 2022 verification report records it as 'not addressed' while the 2024 monitoring report states it is 'deemed negligible' with no quantified deduction
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 8,976 | 8,975 | 1 | |
| 2018 | 127,369 | 127,369 | 0 | |
| 2019 | 171,380 | 44,520 | 126,860 | |
| 2020 | 98,452 | 5,000 | 93,452 | |
| 2021 | 163,282 | 365 | 162,917 | |
| 2022 | 151,735 | 0 | 151,735 | |
| 2023 | 34,322 | 0 | 34,322 | |
| Total | 755,516 | 186,229 | 569,287 |
Risk Indicators
VVB-verified investment test
Avoidance project, no reversals
0% deduction, justification inconsistent
Method contradictory across docs
No FPIC, no grievance mechanism
Not CORSIA-eligible, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →