6.0 MW Biomass based power project of Agri Gold Projects Limited (AGPL), Prakasham District, Andhra Pradesh.
#220of 352 in Biomass#855of 975 in India#1318of 1459 in CDM (UNFCCC)#520of 806 in AMS-I.D
Audit Analysis
This 6 MW CDM biomass power project in Andhra Pradesh has a jurisdictional baseline and a combined additionality test, but the VVB did not confirm the additionality assessment and five material findings (including an expired methodology, incomplete project boundary, and inconsistent emission calculations) required corrective action. No verification-period emission data, buffer pool, or leakage quantification was found in the available documents, leaving significant evidence gaps on delivery and permanence.
Red Flags
- Additionality test (combined) was NOT verified by the VVB (TÜV NORD CERT), a critical gap for CDM compliance
- Five material findings at validation, including use of an expired methodology version (AMS I.D v15/16) and an emission-reduction calculation approach inconsistent with the registered PDD
- No buffer pool percentage or reversal-risk mitigation is stated in any available document
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
- FPIC status is contradictory: the PDD claims it was conducted, but the validation report records it as not conducted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 54,422 | 0 | 54,422 | |
| 2008 | 17,393 | 0 | 17,393 | |
| 2012 | 52,751 | 0 | 52,751 | |
| Total | 124,566 | 0 | 124,566 |
Risk Indicators
Combined test present but not VVB-verified
no reversal events recorded
0% deduction, 'deemed negligible' only
Jurisdictional grid EF, reassessed 2012
Safeguards mentioned; FPIC contradictory; no grievance mecha
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →