6.15 MW wind power project in Rajasthan, India

CDM-4481 ↗

#61of 1935 in Renewable energy#36of 975 in India#39of 1459 in CDM (UNFCCC)#21of 806 in AMS-I.D

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A 6.15 MW CDM wind project in Rajasthan with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered approximately 85% of its pro-rata ex-ante expectation for the first monitoring period, consistent with wind variability. Moderate concerns arise from four resolved corrective action requests, a 2007 grid emission factor, and a discrepancy in the stated crediting period between the validation and monitoring reports.

Red Flags

  • Crediting period stated as 2011–2021 in the monitoring report but 2009–2019 in the validation report, indicating a parameter change that is not clearly documented
  • Grid emission factor of 0.9017 tCO2/MWh is drawn from 2007 CEA data, which is over five years old at the time of the monitoring report
  • Four corrective action requests (CARs) were raised during validation, including missing host-country approval and insufficient substantiation of the investment analysis
  • CORSIA eligibility and CCP status are not stated in any available document

Credit Vintages

IssuedRetiredAvailable
2013
13,079013,079
Total13,079013,079

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional but grid EF from 2007

Safeguards

Safeguards mentioned, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents