Vai al contenuto principale
VCS Energy industries (renewable/non-renewable sources) India Registry: Registered Documentazione completa General Methodology v2.0

6.25 MW Wind Power Generation project of Salora International Limited

VCS-269 ↗

6.3 / 10
Integrity
6.8
Transparency
6.1
Claim Safety
5.9
Documentation
6.4

Score Breakdown

Integrity

verified Additionality was tested using an investment test and was confirmed by the VVB in the validation/verification documentation.

missing The baseline is project-specific and the last reassessment date is not stated; leakage deduction is not visible in the extracted record.

Transparency

verified The project has a named VVB, a defined monitoring period, and the monitoring report and validation report are both present in the evidence set.

missing Usage monitoring details are not stated, and the record shows a major discrepancy in verified ER totals across documents.

Claim Safety

verified The project is a renewable wind installation under VCS, with no reversal events reported and no material findings in the available verification record.

missing Leakage treatment is incomplete in the extracted facts, and the project is not CORSIA-eligible, which limits claim portability.

Documentation

verified The evidence set includes multiple official document types, and extraction confidence is high.

missing Several corrective actions were required, including missing commissioning and meter documentation, which indicates the file was not fully complete at review.

Detailed Analysis

Integrity

The project benefits from VVB-confirmed additionality through an investment test, and the available verification record reports no material findings. That said, the baseline is described only as project-based, the last reassessment date is not stated, and the leakage deduction percentage is not visible even though leakage is said to be quantified. No reversal events are reported, which is appropriate for a wind avoidance project, but permanence evidence is still limited by the absence of a buffer-pool figure.

Transparency

Transparency is moderate because the record includes a named VVB, a monitoring period, and multiple official documents, including validation, monitoring, PDD, and issuance materials. However, usage monitoring methodology is not stated, and the extracted record does not show the grid emission factor year or a clear leakage deduction value. The large discrepancy in verified ER totals across documents also weakens the clarity of the public record.

Claim Safety

Claim safety is mixed. The project is a VCS wind project with no reversal events reported and no material findings, which supports lower physical-risk concerns, but the leakage treatment is incomplete in the extracted facts and the baseline is not clearly standardized or recently reassessed. The project is not CORSIA-eligible, which reduces one channel of claim risk, but the absence of a visible leakage deduction and the ER discrepancy keep over-crediting risk above ideal.

Documentation

Documentation quality is fair but not strong. The evidence set spans several official document types and extraction confidence is high, yet the monitoring report still lists multiple corrective actions, including missing commissioning certificates, meter details, and some historical invoice/JMR gaps. The project dates are also relatively old, with a monitoring period ending in 2016 and later review activity in 2021, so recency is limited.

Overall

I privileged the later validation/verification figures where contradictions existed, because they are more recent and appear to reflect the final reviewed position; this is especially relevant for the verified ER total. I also treated the 2021 monitoring report as stronger evidence for safeguards than the older 2010 report, since it is more recent and explicitly states FPIC, grievance, and benefit-sharing elements. The main reliability issue is the contradiction in verified ER totals and the incomplete visibility of leakage and usage-monitoring details, which justifies a cautious mid-range score rather than a high one.

Audit Analysis

This is a registered VCS wind project with VVB-confirmed investment-test additionality and no material findings reported, which supports moderate integrity. However, the baseline is project-specific rather than clearly reassessed, leakage treatment is only described as quantified without a visible deduction value, and the record contains several contradictions that reduce confidence in the evidence trail.

Project Description

Proponent: Salora International Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 9440 tCO2e Region: Asia Registration date: 2010-01-06

Red Flags

  • The record shows a large discrepancy in verified ERs between documents, and the later validation report is being privileged because it is more recent and appears to reflect the final issuance position.
  • Leakage is described as quantified, but the actual deduction percentage is not stated in the extracted record, leaving a gap in over-crediting assessment.

Credit Vintages

Issued Retired Available
2006
2,282 0 2,282
2007
3,807 0 3,807
2008
8,125 0 8,125
2009
8,707 3,298 5,409
2010
6,521 6,521 0
2011
7,885 7,885 0
2012
9,148 7,680 1,468
2013
8,497 8,497 0
2014
7,608 7,608 0
2015
5,574 5,574 0
2016
5,057 5,057 0
Total 73,211 52,120 21,091

Cosa migliorerebbe questo punteggio

  • Publish the leakage deduction percentage, baseline reassessment history, and usage monitoring method in a single consolidated monitoring note.
  • Resolve the ER total discrepancy with a clear issuance reconciliation and provide the missing meter, commissioning, and historical generation evidence in a complete audit trail.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance project; no reversals reported

Leakage

Leakage described as quantified, but deduction not visible

Baseline

Project baseline; reassessment timing not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti