Skip to main content
CDMWindIndiaAMS-I.D

6.95 MW Bundled Wind Power Project in Gujarat

CDM-10106 ↗

#119of 770 in Renewable energy#66of 387 in India#17of 213 in CDM (UNFCCC)#35of 417 in AMS-I.D

6.1/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

A 6.95 MW bundled wind project in Gujarat validated under CDM AMS-I.D. with a jurisdictional grid baseline and investment additionality test. The VVB (Applus+) substantially reduced the initial PDD claim by roughly 86%, reflecting a conservative validation, but key monitoring, safeguards, and CORSIA details remain undocumented in the available record.

Red Flags

  • The PDD (Nov 2021) claims 91,812 tCO₂e while the validation report (Jan 2022) validates only 13,116 tCO₂e — a ~7× reduction that, while attributable to a lower CEA grid emission factor per CAR#1, signals a very wide initial over-estimate and raises data-reliability questions.
  • No buffer pool percentage, FPIC, grievance mechanism, or CORSIA eligibility is documented in the available record, leaving permanence, safeguards, and dual-channel risk unverified.
  • One of the four evidence documents is listed as 'unknown,' and no monitoring report is present, limiting confidence in ongoing MRV performance.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test identified but VVB confirmation not explicit

Permanence

Avoidance project (low reversal risk) but no buffer pool doc

Leakage

Deemed negligible with 0% deduction — reasonable for grid-co

Baseline

Jurisdictional grid EF (0.9346, 2021 CEA), reassessed 2022

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents