Skip to main content
CDMSolarIndiaAMS-I.D

6 MW bundled grid connected Solar Power project at Katol and Bareilly, India

CDM-6719 ↗

#1209of 1935 in Renewable energy#636of 975 in India#922of 1459 in CDM (UNFCCC)#391of 806 in AMS-I.D

4.8/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 6 MW grid-connected solar project under CDM with a jurisdictional baseline and VVB-confirmed additionality, but significant data gaps in monitoring verification, permanence tracking, and safeguards documentation. The low extraction confidence and absence of verified emission reduction figures limit confidence in actual delivery versus the 64,218 tCO2e lifetime claim.

Red Flags

  • No verified emission reduction figure available — the 64,218 tCO2e claim cannot be cross-checked against actual monitoring data
  • Nine Corrective Action Requests were raised during validation (all closed), indicating moderate documentation or methodological issues at the time of validation
  • Low extraction confidence across the document set, meaning key fields may be missing or misread
  • No permanence or reversal data reported for a project whose crediting period (2012–2019) has already expired

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

Negligible, justified

Baseline

Jurisdictional grid EF

Safeguards

Mentioned, detail lacking

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents