6 MW bundled grid connected Solar Power project at Katol and Bareilly, India
#1209of 1935 in Renewable energy#636of 975 in India#922of 1459 in CDM (UNFCCC)#391of 806 in AMS-I.D
Audit Analysis
A 6 MW grid-connected solar project under CDM with a jurisdictional baseline and VVB-confirmed additionality, but significant data gaps in monitoring verification, permanence tracking, and safeguards documentation. The low extraction confidence and absence of verified emission reduction figures limit confidence in actual delivery versus the 64,218 tCO2e lifetime claim.
Red Flags
- No verified emission reduction figure available — the 64,218 tCO2e claim cannot be cross-checked against actual monitoring data
- Nine Corrective Action Requests were raised during validation (all closed), indicating moderate documentation or methodological issues at the time of validation
- Low extraction confidence across the document set, meaning key fields may be missing or misread
- No permanence or reversal data reported for a project whose crediting period (2012–2019) has already expired
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed
mixed evidence / unresolved risk
Negligible, justified
Jurisdictional grid EF
Mentioned, detail lacking
CORSIA/CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →