7.2 MW Bundled Wind Power Project by TCP Limited. In Tamilnadu, India.
#536of 1935 in Renewable energy#270of 975 in India#353of 1459 in CDM (UNFCCC)#191of 806 in AMS-I.D
Audit Analysis
A 7.2 MW bundled wind power project in Tamil Nadu with a well-supported investment additionality test (IRR of 6.5% well below the 13.0% benchmark) and a standard jurisdictional grid baseline. However, the absence of any monitoring or verification reports in the extracted record means actual emissions reductions cannot be confirmed, and the low extraction confidence further limits assurance. The project is fundamentally sound in design but lacks the operational evidence needed for full confidence.
Red Flags
- No monitoring or verification reports found in the extracted record — actual emissions reductions remain unverified
- Low extraction confidence indicates at least one key document was poorly readable, reducing overall data reliability
- Installed capacity recorded as 0.6 MW appears inconsistent with the 7.2 MW project name, suggesting a possible data extraction error
- 100% equity funding with zero debt is atypical for a commercial wind project and warrants scrutiny of project design intent
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test; IRR well below benchmark
Avoidance project; no reversal mechanism
0% deduction; reasonable for grid-displacing wind
Jurisdictional grid EF; reassessment timing not stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →