7.25 MW wind energy project of Aruppukottai Sri Jayavilas Ltd, Tamilnadu, India
#1074of 1935 in Renewable energy#555of 975 in India#798of 1459 in CDM (UNFCCC)
Audit Analysis
A 7.25 MW CDM wind project in Tamil Nadu, India, with a standard grid-emission-factor baseline and smart-meter monitoring. The project is undermined by a critical contradiction in the VVB's additionality verification across two validation reports, a grid emission factor discrepancy (0.93 vs 0.82), and under-delivery of roughly 38% against the pro-rata expectation for the monitored period. No reversal risk exists for this avoidance-type project, and leakage treatment is appropriate.
Red Flags
- The 2009 validation report (SGS UK) states additionality was NOT verified by the VVB, directly contradicting the 2007 validation report which confirmed it — a fundamental CDM requirement in question.
- Grid emission factor appears as both 0.93 and 0.82 across monitoring reports, a 13% discrepancy that materially affects credit quantities.
- The project delivered only ~62% of the pro-rata ERR expectation for the monitored period (14,849 vs ~23,970 tCO₂e), suggesting the PDD lifetime estimate of 93,317 tCO₂e may be optimistic.
- Baseline method is described as 'project' in the 2013 monitoring report but 'jurisdictional' in the 2007 validation report — an inconsistency in a core methodological parameter.
- No grievance mechanism and no FPIC process documented, despite safeguards being mentioned in the monitoring report.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 12,296 | 0 | 12,296 | |
| 2010 | 14,763 | 0 | 14,763 | |
| 2011 | 14,941 | 0 | 14,941 | |
| Total | 42,000 | 0 | 42,000 |
Risk Indicators
Combined test present but VVB verification contradicted acro
Avoidance project, no reversal risk or events
0% deduction with quantified justification, sector-appropria
Grid EF baseline but method label contradicted; EF from 2005
Mentioned in monitoring report but absent from validation; n
CORSIA excluded but CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →