5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A 7.5 MW biomass power plant in India under CDM with verified additionality (investment test, Bureau Veritas) and a reasonable 0% leakage deduction for grid displacement. However, feedstock sustainability and carbon content are not documented, the baseline method shows a contradiction between project-specific and jurisdictional characterisation, and four material findings (all corrected) indicate initial quality-control gaps. The project is at the end of its crediting period with moderate data completeness.

Red Flags

  • Feedstock sustainability and carbon content testing are not stated in any available document, leaving the biomass supply chain unverified for a biomass energy project
  • Baseline method is contradictory: the 2022 monitoring report describes it as project-specific while the 2013 report describes it as jurisdictional, creating uncertainty about the baseline's robustness
  • Four material findings at validation (incorrect project category, wrong investment-analysis method, expired methodology version, missing DG-set monitoring) indicate initial documentation quality issues, all subsequently corrected
  • Grid emission factor is from 2008 (0.8032 tCO2/MWh); no evidence of periodic update is found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2015
27,018027,018
Total27,018027,018

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Energy substitution, no reversals

Leakage

0% justified for grid displacement

Baseline

Project-specific, method contradiction

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents