A 7.5 MW bundled small hydropower project in Guizhou, China, with a jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. The verification report identified several metering and substation-identification discrepancies that required corrective actions, and the crediting period differs between the validation and monitoring reports. Overall the project is structurally sound but carries moderate data-quality and documentation gaps.
Red Flags
- Three metering-related material findings (wrong substation name, inability to separate grid draw for two sub-projects, meter location discrepancy) required corrective actions, introducing uncertainty in the electricity accounting underlying CER calculations.
- Crediting period is inconsistent between the validation report (2008-10-01 to 2015-10-01) and the 2012 monitoring report (2009-08-21 to 2016-08-20), creating ambiguity about the true registered period and total credit ceiling.
- No buffer pool percentage, reversal-event history, or permanence mechanism is stated in any available document, leaving the permanence risk for this hydro asset unquantified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 28,356 | 0 | 28,356 | |
| 2013 | 15,983 | 0 | 15,983 | |
| Total | 44,339 | 0 | 44,339 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deemed negligible, reasonable for grid hydro
Jurisdictional grid EF, standard approach
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →