7.5 MW wind energy project by Taurian Iron and Steel in the State of Gujarat
#172of 1935 in Renewable energy#84of 975 in India#103of 1459 in CDM (UNFCCC)#60of 806 in AMS-I.D
Audit Analysis
A 7.5 MW CDM wind project in Gujarat with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project is an avoidance-type credit with no inherent reversal risk, and leakage is reasonably deemed negligible. Key gaps include the absence of a stated buffer pool, a null verified ERR figure in the extracted record, and a crediting-period date discrepancy between the validation and monitoring reports.
Red Flags
- Crediting period start date differs between the validation report (01/03/2010) and the monitoring report/PDD (16/09/2010), creating ambiguity about the exact first monitoring window.
- Verified ERR for the monitoring period was not cleanly extracted (null), preventing independent cross-check of the 14,410 tCO2 figure cited in the monitoring report against the 157,000 tCO2 lifetime PDD estimate.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 14,407 | 0 | 14,407 | |
| Total | 14,407 | 0 | 14,407 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF baseline
Safeguards mentioned, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →