7.5 MW wind power project at Jaisalmer, India
#2of 1935 in Renewable energy#2of 975 in India#2of 1459 in CDM (UNFCCC)#2of 806 in AMS-I.D
Audit Analysis
A well-structured CDM wind power project with a VVB-confirmed investment additionality test, a jurisdictional grid-emission-factor baseline, and no reversal or leakage concerns. The first monitoring period delivered roughly 77% of the pro-rata expectation, consistent with wind variability. Minor gaps exist in safeguards documentation (FPIC, grievance mechanism) and CORSIA/CCP eligibility is unstated.
Red Flags
- FPIC and grievance mechanism are not documented in the extracted record, leaving safeguards coverage partially unverified
- CORSIA eligibility and CCP status are not stated in any available document, creating uncertainty about dual-channel crediting risk
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 9,719 | 0 | 9,719 | |
| Total | 9,719 | 0 | 9,719 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, justified for grid-connected wind
Jurisdictional grid EF baseline
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →