Skip to main content
CDMWindIndiaAMS-I.D

7.5 MW wind power project at Jaisalmer, India

CDM-5576 ↗

#2of 1935 in Renewable energy#2of 975 in India#2of 1459 in CDM (UNFCCC)#2of 806 in AMS-I.D

7.4/ 10
Integrity
7.5
Transparency
7.0
Claim Safety
7.5
Documentation
7.5

Audit Analysis

A well-structured CDM wind power project with a VVB-confirmed investment additionality test, a jurisdictional grid-emission-factor baseline, and no reversal or leakage concerns. The first monitoring period delivered roughly 77% of the pro-rata expectation, consistent with wind variability. Minor gaps exist in safeguards documentation (FPIC, grievance mechanism) and CORSIA/CCP eligibility is unstated.

Red Flags

  • FPIC and grievance mechanism are not documented in the extracted record, leaving safeguards coverage partially unverified
  • CORSIA eligibility and CCP status are not stated in any available document, creating uncertainty about dual-channel crediting risk

Credit Vintages

IssuedRetiredAvailable
2013
9,71909,719
Total9,71909,719

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for grid-connected wind

Baseline

Jurisdictional grid EF baseline

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.: Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents