Audit Analysis
A 7.5 MW CDM wind project in Rajasthan with a sound fundamental design (investment-test additionality confirmed by SGS, jurisdictional grid baseline, no reversal risk), but the validation report flagged seven material findings and required fourteen corrective actions, and the extracted record contains no monitoring or verification data. The low extraction confidence and absence of post-validation evidence limit the ability to confirm that claimed reductions were actually delivered.
Red Flags
- Seven material findings in the validation report, including inconsistencies in grid emission factor values and a monitoring plan that did not match the actual metering scenario observed at site
- Fourteen corrective actions were required before validation could be granted, indicating significant initial documentation gaps
- No monitoring reports or verification reports were found in the extracted record; total verified emissions reductions are not available
- Minimum extraction confidence is rated low, and one evidence document could not be identified (listed as 'unknown')
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by SGS
Wind avoidance – no reversal risk
0 % deemed negligible – appropriate for grid wind
Jurisdictional grid EF but inconsistencies flagged
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →