8.0 MW Biomass Based Power Project at Mahasamund, India
#172of 352 in Biomass#759of 975 in India#1135of 1459 in CDM (UNFCCC)#461of 806 in AMS-I.D
Audit Analysis
A CDM biomass power project (Mahasamund, India) with a VVB-confirmed investment additionality test and a standardised AMS I-D methodology, but significant evidence gaps including no monitoring or verification data, a project-specific baseline, no feedstock sustainability assessment, and low extraction confidence across the document set. Four contradictions between the PDD and validation report (leakage, additionality type, baseline method, crediting period) were resolved in favour of the later-dated validation report, but the discrepancies reduce confidence in the underlying data.
Red Flags
- Project name discrepancy: title states 8.0 MW while the extracted project name reads 5.0 MW — capacity is unconfirmed
- No monitoring report or verification report data available; total ERR verified figure is absent, so over- or under-delivery cannot be assessed
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
- No feedstock sustainability or carbon-content testing data found for a biomass project
- Four contradictions between PDD and validation report on leakage, additionality type, baseline method, and crediting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
energy project (lower risk)
0% deemed negligible, not quantified
Project-specific baseline, 2006 grid EF
Safeguards mentioned; no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →