8.053MW CHUNIL PV(photovoltaic) power plant bundling CDM Project

CDM-3507 ↗

#1405of 1935 in Renewable energy#17of 24 in South Korea#1136of 1459 in CDM (UNFCCC)#462of 806 in AMS-I.D

4.5/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 2010 CDM solar PV project in South Korea with a VVB-confirmed investment additionality test and a jurisdictional grid baseline, but the validation process surfaced nine corrective action requests indicating substantial PDD quality issues. No monitoring data, verified emission reductions, or permanence mechanisms (buffer pool) are available in the extracted record, and the overall document confidence is low. The project is structurally sound for a PV displacement project but suffers from significant documentation and transparency gaps.

Red Flags

  • Nine corrective action requests (CARs) were raised during validation, covering unsupported plant load factors, missing CDM-benefit evidence, investment cost discrepancies, inconsistent emission reduction figures, and absent stakeholder consultation records — indicating a materially flawed initial PDD.
  • No monitoring period, verified emission reductions, or usage monitoring method is available in the extracted record, making it impossible to confirm actual delivery against the claimed 8,433 tCO₂e/yr.
  • Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of all extracted figures.
  • No buffer pool or permanence mechanism is documented, leaving no safeguard against potential credit reversal if the PV plant is decommissioned before the end of the crediting period.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent risk for PV

Leakage

0% deemed negligible, consistent with PV displacement

Baseline

Jurisdictional grid EF (2007); no reassessment data

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents