Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

8 MW bundled wind power project, proposed by Ghodawat Industries (India) Pvt. Ltd.

VCS-1069 ↗

#999of 1935 in Renewable energy#507of 975 in India#640of 1339 in Verra (VCS)#322of 806 in AMS-I.D

5.1/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
6.0
Documentation
3.5

Audit Analysis

A straightforward 8 MW grid-connected wind project in India with a jurisdictional baseline and VVB-confirmed additionality, but the verification process surfaced over 30 material findings and corrective actions, many relating to meter calibration delays, missing generation data snapshots, and monitoring report inconsistencies. The project delivered roughly 80% of its pro-rata ex-ante expectation for the four-year monitoring period, which is within normal wind variability. Fundamental carbon integrity is sound for a renewable energy project, but documentation and monitoring rigor are weak.

Red Flags

  • Over 30 material findings reported in the verification report, including delayed meter calibration for Bundle II (March 2013 to December 2013, and December 2014 to March 2016) with an ad-hoc 0.2% error factor applied
  • JMRs (Joint Meter Reading Reports) supporting net electricity supplied to the grid were not made available to the verification team for the full monitoring period
  • Grid emission factors in the monitoring report did not align with the recent CEA version 2, raising questions about the accuracy of the 0.92975 tCO2/MWh figure used
  • Location numbers for all 7 wind turbines observed during the site visit did not match the approved PDD
  • Snapshot copies of generation data for the last day of each month were not submitted, citing practical difficulties

Credit Vintages Exhausted

IssuedRetiredAvailable
2009
11,62011,6200
2010
3,9253,9250
2011
2,1002,1000
2012
8,3668,3660
2013
8,7728,7720
2014
9,6819,6810
2015
9,7349,7340
2016
9479470
Total55,14555,1450

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Renewable energy – no reversal risk

Leakage

0% – negligible for grid export

Baseline

Jurisdictional but reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AMS-I.D. Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents