4.8/ 10
Integrity
6.0
Transparency
3.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

The 8 MW OGPL Chipa biomass power plant in India has a solid additionality foundation (VVB-verified investment test) and a jurisdictional baseline, but the project record is severely limited by the absence of any monitoring or verified emissions data. A significant discrepancy between the PDD and validation report on total emissions reductions (a factor-of-seven gap) undermines confidence in the claimed figures, and feedstock sustainability is entirely undocumented for a biomass project.

Red Flags

  • ERR contradiction: the PDD (Mar 2012) reports 277,719 tCO₂e while the validation report (May 2012) reports 39,674 tCO₂e — a 7× gap that, while likely reflecting annual vs. 7-year totals, was never explicitly reconciled in the documents
  • No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to confirm whether the project delivered on its ex-ante claims
  • Feedstock sustainability, carbon content testing, and LCA are all absent from the documentation for a biomass energy project
  • Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the available data

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, reasonable

Baseline

Jurisdictional, grid EF 0.7984

Safeguards

Mentioned but FPIC/grievance undocumented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents