8 MW OGPL Chipa power plant
#124of 352 in Biomass#638of 975 in India#924of 1459 in CDM (UNFCCC)#392of 806 in AMS-I.D
Audit Analysis
The 8 MW OGPL Chipa biomass power plant in India has a solid additionality foundation (VVB-verified investment test) and a jurisdictional baseline, but the project record is severely limited by the absence of any monitoring or verified emissions data. A significant discrepancy between the PDD and validation report on total emissions reductions (a factor-of-seven gap) undermines confidence in the claimed figures, and feedstock sustainability is entirely undocumented for a biomass project.
Red Flags
- ERR contradiction: the PDD (Mar 2012) reports 277,719 tCO₂e while the validation report (May 2012) reports 39,674 tCO₂e — a 7× gap that, while likely reflecting annual vs. 7-year totals, was never explicitly reconciled in the documents
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to confirm whether the project delivered on its ex-ante claims
- Feedstock sustainability, carbon content testing, and LCA are all absent from the documentation for a biomass energy project
- Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the available data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test
mixed evidence / unresolved risk
0% deemed negligible, reasonable
Jurisdictional, grid EF 0.7984
Mentioned but FPIC/grievance undocumented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →