The 82 MW Lau Renun hydro project uses a standard jurisdictional (grid emission factor) baseline and a VVB-confirmed additionality test, but the verification report carries multiple corrective actions—including a requirement to further justify additionality and an unacceptable CH4 exclusion—indicating substantive gaps in the original submission. The project is not CORSIA-eligible and leakage is deemed negligible, which is reasonable for a grid-connected hydro plant, but the absence of a stated buffer pool and the 'not addressed' reversal treatment leave permanence safeguards under-documented.
Red Flags
- CAR 2 in the 2022 verification report requires further justification of the additionality demonstration, and CAR 7 states the CH4 exclusion justification is not acceptable—both are substantive integrity concerns raised by the VVB
- Buffer pool percentage is not stated in any available document, and reversal events are marked as 'not addressed', leaving permanence risk unquantified
- Eleven contradictions across documents (baseline method, additionality test type, grid EF, leakage justification, FPIC, grievance mechanism, crediting period) indicate inconsistent reporting over the project's history
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 148,966 | 148,966 | 0 | |
| 2010 | 201,620 | 201,620 | 0 | |
| 2011 | 218,483 | 218,483 | 0 | |
| 2012 | 276,736 | 227,203 | 49,533 | |
| 2013 | 257,736 | 241,428 | 16,308 | |
| 2014 | 214,524 | 214,524 | 0 | |
| 2015 | 234,802 | 188,936 | 45,866 | |
| 2016 | 186,385 | 76,533 | 109,852 | |
| 2017 | 236,965 | 137,912 | 99,053 | |
| 2018 | 218,237 | 112,925 | 105,312 | |
| 2019 | 228,769 | 196,721 | 32,048 | |
| 2020 | 186,008 | 186,008 | 0 | |
| Total | 2,609,231 | 2,151,259 | 457,972 |
Risk Indicators
VVB-confirmed but CAR 2 requires further justification; test type changed between validations
mixed evidence / unresolved risk
0% deduction, deemed negligible—reasonable for grid-connected hydro
Jurisdictional grid-EF baseline, last reassessed 2017; 10-year VCS ALM reassessment not yet due (~2026)
FPIC and safeguards mentioned per 2022 docs, but grievance mechanism absent per 2013 verification; inconsistent across documents
CORSIA not eligible; CCP status not stated in any available document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →