Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Indonesia Registry: RegisteredACM0002

82 MW Lau Renun Hydro Power Plant, North Sumatra

VCS-488 ↗

#475of 1935 in Renewable energy#5of 33 in Indonesia#245of 1339 in Verra (VCS)#356of 1287 in ACM0002

5.8/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The 82 MW Lau Renun hydro project uses a standard jurisdictional (grid emission factor) baseline and a VVB-confirmed additionality test, but the verification report carries multiple corrective actions—including a requirement to further justify additionality and an unacceptable CH4 exclusion—indicating substantive gaps in the original submission. The project is not CORSIA-eligible and leakage is deemed negligible, which is reasonable for a grid-connected hydro plant, but the absence of a stated buffer pool and the 'not addressed' reversal treatment leave permanence safeguards under-documented.

Red Flags

  • CAR 2 in the 2022 verification report requires further justification of the additionality demonstration, and CAR 7 states the CH4 exclusion justification is not acceptable—both are substantive integrity concerns raised by the VVB
  • Buffer pool percentage is not stated in any available document, and reversal events are marked as 'not addressed', leaving permanence risk unquantified
  • Eleven contradictions across documents (baseline method, additionality test type, grid EF, leakage justification, FPIC, grievance mechanism, crediting period) indicate inconsistent reporting over the project's history

Credit Vintages

IssuedRetiredAvailable
2009
148,966148,9660
2010
201,620201,6200
2011
218,483218,4830
2012
276,736227,20349,533
2013
257,736241,42816,308
2014
214,524214,5240
2015
234,802188,93645,866
2016
186,38576,533109,852
2017
236,965137,91299,053
2018
218,237112,925105,312
2019
228,769196,72132,048
2020
186,008186,0080
Total2,609,2312,151,259457,972

Risk Indicators

Additionality

VVB-confirmed but CAR 2 requires further justification; test type changed between validations

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible—reasonable for grid-connected hydro

Baseline

Jurisdictional grid-EF baseline, last reassessed 2017; 10-year VCS ALM reassessment not yet due (~2026)

Safeguards

FPIC and safeguards mentioned per 2022 docs, but grievance mechanism absent per 2013 verification; inconsistent across documents

Double-claim

CORSIA not eligible; CCP status not stated in any available document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents