9.0 MW grid connected bundled wind electricity generation project at Tirunelveli, Tamilnadu
#462of 975 in India#644of 1459 in CDM (UNFCCC)#301of 806 in AMS-I.D
Audit Analysis
A 9 MW grid-connected wind project in Tamil Nadu validated under CDM AMS I.D with a VVB-confirmed investment additionality test and a reasonable 0% leakage deduction. However, a contradiction between the PDD and validation report on baseline method, the absence of any monitoring or verification data, and low extraction confidence across 13 documents limit confidence in the project's ongoing performance and data reliability.
Red Flags
- Baseline method is described as 'project' in the validation report (June 2010) but 'jurisdictional' in the PDD (February 2010) — an unresolved contradiction that undermines baseline reliability
- No monitoring reports, verification reports, or verified ERR figures are present in the extracted record; the project's actual performance over its 2009–2019 crediting period cannot be confirmed
- Low extraction confidence across the document set, with one document of unknown type, reducing trust in the completeness of the evidence base
- 21 Corrective Action Requests and 30 Clarification Requests were raised during validation, indicating significant documentation quality issues at the time of approval
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justified for grid wind
Project vs jurisdictional contradiction
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →