9.8 MW Renewable Energy Generation for the grid at South Asian Agro Industries Limited in Raipur District, Chattisgarh.

CDM-1175 ↗

#1of 196 in Biomass#18of 387 in India#3of 213 in CDM (UNFCCC)#9of 417 in AMS-I.D

6.7/ 10
Integrity
7.5
Transparency
5.5
Claim Safety
7.0
Documentation
6.0

Audit Analysis

A 9.8 MW biomass-to-grid project in Chhattisgarh, India, with a well-confirmed additionality case (combined test, IRR below WACC) and a standard jurisdictional grid baseline. The project delivered roughly half of its pro-rata expected emissions reductions in the first monitoring period, indicating a conservative credit issuance. Several transparency fields (feedstock monitoring, CORSIA/CCP status) remain unaddressed in the available documents.

Red Flags

  • Crediting period end date is missing in the monitoring report; only the validation report (2008) specifies the full 10-year window (2007-09 to 2017-09).
  • Feedstock sustainability, carbon content testing, and usage monitoring method are not stated in any available document, leaving a gap in biomass supply-chain verification.
  • CORSIA eligibility and CCP status are not stated, so dual-channel or double-claiming risk cannot be explicitly excluded.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test; IRR below WACC

Permanence

Avoidance project; no reversal events

Leakage

0% with surplus-biomass justification

Baseline

Jurisdictional grid EF (0.887, 2005)

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents