9 MW Neria Hydroelectric project, Karnataka, India
#1211of 1935 in Renewable energy#639of 975 in India#925of 1459 in CDM (UNFCCC)#393of 806 in AMS-I.D
Audit Analysis
The 9 MW Neria hydro project is a CDM-registered small hydro scheme with VVB-confirmed additionality and no inherent reversal risk, but it carries significant documentation gaps, a contradictory ERR figure within the same monitoring report, and multiple unresolved material findings that undermine confidence in the credit quantity and monitoring rigour.
Red Flags
- The monitoring report (Dec 2021) contains two different total ERR figures — 39,260 and 85,000 — within the same document, creating a 2.2× discrepancy that cannot be resolved without the verified ERR figure
- The validation report (2008) characterises the baseline as jurisdictional while the monitoring report (2021) calls it project-specific, and the grid emission factor of 857 gCO₂/kWh is drawn from the 2005-06 assessment year, making the baseline potentially stale
- Multiple material findings remain: the registered PDD listed two energy meters but the site visit confirmed four; calibration frequency was absent from the PDD; and the monitoring plan lacked clear measurement procedures for key parameters
- Corrective action CL 1 requires the proponent to supply a detailed IRR analysis, geology study data, and a copy of the PPA to substantiate additionality — evidence that the original additionality case was incomplete at verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 17,741 | 0 | 17,741 | |
| 2013 | 37,543 | 0 | 37,543 | |
| 2022 | 43,475 | 0 | 43,475 | |
| Total | 98,759 | 0 | 98,759 |
Risk Indicators
VVB-confirmed but evidence gaps (CL 1)
Hydro – no reversal risk
0 % deduction, justified as negligible
Method contradiction; 2005-06 grid EF
Mentioned but FPIC/grievance details absent
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →