998.64 kWp Grid Connected Rooftop Solar Plant at Berger Paints, Jejuri, Maharashtra, India
#1479of 1935 in Renewable energy#10of 433 in Universal Carbon Registry (UCR)#495of 806 in AMS-I.D
Audit Analysis
A small (~1 MW) grid-connected rooftop solar project under the UCR registry with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record contains only the PDD — no verification report, no monitoring report, and no VVB identification. The project type is inherently low-risk, yet the absence of independent verification and documented additionality testing limits confidence in the claimed 1,355 tCO₂e.
Red Flags
- No verification report or monitoring report is present in the extracted record; the claimed 1,355 tCO₂e ERR has no independently verified counterpart.
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unverified.
- Only a single document (the PDD) was used for extraction, meaning no independent third-party review is evidenced.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Not documented in available record
Avoidance project, minimal reversal risk
0% deemed negligible, appropriate for rooftop solar
Jurisdictional baseline with specific grid EF
Safeguards mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →