Skip to main content
ICRAvoidance / ReductionTRACM0002

Aşağı Kaleköy Solar Power Plant

ICR-261 ↗

#345of 1935 in Renewable energy#3of 75 in TR#6of 154 in Intl. Carbon Registry (ICR)#256of 1287 in ACM0002

6.0/ 10
Integrity
6.0
Transparency
6.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A grid-connected solar PV project in Turkey using the well-established ACM0002 methodology, with a jurisdictional baseline and VVB-verified additionality. The core carbon accounting is sound and the project delivered approximately 91% of its pro-rata expectation for the elapsed monitoring period. However, 11 corrective action requests and 12 clarification requests raised during verification, along with 8 cross-document contradictions, indicate meaningful data-quality and documentation-consistency issues that temper confidence.

Red Flags

  • 11 corrective action requests and 12 clarification requests were raised during verification, covering inconsistencies in electricity values, installed capacity, emission reduction values, grid emission factor notation, and calculation errors in the monitoring report
  • CORSIA eligibility is confirmed while CCP status is not stated, creating a dual-channel allocation risk
  • The verification report cited ICR Requirement v4.0 instead of the applicable v5.0, and Section 7 lacked the required explicit opinion type, assurance level, and responsible-party statement
  • The monitoring report incorrectly referenced hydropower plant impacts instead of solar power plant impacts in multiple sections

Credit Vintages

IssuedRetiredAvailable
2020
4660466
2021
85,122085,122
2022
84,458084,458
2023
83,799083,799
2024
83,145083,145
2025
82,496082,496
2026
81,851081,851
2027
81,212081,212
2028
80,579080,579
2029
79,950079,950
2030
78,891078,891
Total821,9690821,969

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, grid-connected solar

Baseline

Jurisdictional, 2022 grid EF

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA-eligible, CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002: Grid-connected electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents