Aşağı Kaleköy Solar Power Plant
#345of 1935 in Renewable energy#3of 75 in TR#6of 154 in Intl. Carbon Registry (ICR)#256of 1287 in ACM0002
Audit Analysis
A grid-connected solar PV project in Turkey using the well-established ACM0002 methodology, with a jurisdictional baseline and VVB-verified additionality. The core carbon accounting is sound and the project delivered approximately 91% of its pro-rata expectation for the elapsed monitoring period. However, 11 corrective action requests and 12 clarification requests raised during verification, along with 8 cross-document contradictions, indicate meaningful data-quality and documentation-consistency issues that temper confidence.
Red Flags
- 11 corrective action requests and 12 clarification requests were raised during verification, covering inconsistencies in electricity values, installed capacity, emission reduction values, grid emission factor notation, and calculation errors in the monitoring report
- CORSIA eligibility is confirmed while CCP status is not stated, creating a dual-channel allocation risk
- The verification report cited ICR Requirement v4.0 instead of the applicable v5.0, and Section 7 lacked the required explicit opinion type, assurance level, and responsible-party statement
- The monitoring report incorrectly referenced hydropower plant impacts instead of solar power plant impacts in multiple sections
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 466 | 0 | 466 | |
| 2021 | 85,122 | 0 | 85,122 | |
| 2022 | 84,458 | 0 | 84,458 | |
| 2023 | 83,799 | 0 | 83,799 | |
| 2024 | 83,145 | 0 | 83,145 | |
| 2025 | 82,496 | 0 | 82,496 | |
| 2026 | 81,851 | 0 | 81,851 | |
| 2027 | 81,212 | 0 | 81,212 | |
| 2028 | 80,579 | 0 | 80,579 | |
| 2029 | 79,950 | 0 | 79,950 | |
| 2030 | 78,891 | 0 | 78,891 | |
| Total | 821,969 | 0 | 821,969 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, grid-connected solar
Jurisdictional, 2022 grid EF
Grievance mechanism present, FPIC not conducted
CORSIA-eligible, CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →