Skip to main content
ACROzone Depleting SubstancesOHIO, USGeneral Methodologyv2.1

A-Gas 2019-3

ACR-443 ↗

#247of 345 in United States#110of 147 in American Carbon Registry (ACR)

4.2/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A-Gas 2019-3 is an ozone-depleting-substance destruction project under the ACR standard in Ohio, verified by Ruby Canyon Environmental. The verification report confirms that claimed and verified ERR figures match exactly at 114,871, and no corrective actions were required, but the extracted record lacks critical integrity elements including additionality testing, baseline methodology, and leakage treatment. The three material findings are minor administrative address discrepancies that do not affect credit quantities.

Red Flags

  • No additionality test type or VVB confirmation of additionality found in the extracted record from the verification report
  • Baseline methodology and last reassessment date are not stated in any available document
  • Leakage deduction and justification are absent from the extracted record despite being a standard requirement under ACR
  • Monitoring period (Nov 2018 – Jan 2019, ~2 months) is very short relative to the 10-year crediting period (Oct 2018 – Dec 2028), limiting the evidentiary basis for the full crediting period

Credit Vintages Exhausted

IssuedRetiredAvailable
2019
114,87100
Total114,87100

Risk Indicators

Additionality

No additionality test found in record

Permanence

ODS destruction – no carbon-stock reversal risk

Leakage

Not addressed in extracted record

Baseline

Baseline method not stated

Safeguards

Not documented; limited applicability for industrial ODS project

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents