Skip to main content
ACROzone Depleting SubstancesOHIO, USGeneral Methodologyv2.1

A-Gas 3-2023B

ACR-1007 ↗

#64of 389 in United States#29of 195 in American Carbon Registry (ACR)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A-Gas 3-2023B is an ozone-depleting-substance destruction project in Ohio verified under the ACR/ARB ODS Compliance Offset Protocol. Additionality is well-supported by a combined test confirmed by the VVB, and the verified ERR matches the claimed figure exactly for the four-month monitoring period. However, leakage treatment is absent from the available record, the baseline is project-specific with no reassessment data, and a minor administrative non-conformance (an omitted transporter in the chain of custody) triggered a qualified positive verification statement.

Red Flags

  • Leakage deduction and justification are not stated in any available document, leaving the treatment of potential ODS leakage unaddressed.
  • The verification report (Nov 2024) records a material finding that Landstar Inc., a transporter of material over 500 lbs to the Bowling Green facility, was omitted from the chain of custody on the OPDR, resulting in a qualified positive statement.

Credit Vintages Exhausted

IssuedRetiredAvailable
2024
79,56500
Total79,56500

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

ODS destruction – no carbon-stock risk

Leakage

Not addressed in available documents

Baseline

Project-specific, no reassessment data

Safeguards

Not stated in extracted record

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents